The actual cost of every job

Material, labor and overhead for each work order, and the cost per unit next to your standard cost.

Job costSample data
Jobs costed
6
Flagged
2
Over standard
+$484
  • WO-24098 Drive shaft $38.20 → $44.10 +15.4%
  • WO-24109 Valve body $61.50 → $66.90 +8.8%
  • WO-24125 Enclosure lid $11.40 → $11.62 +1.9%
  • WO-24117 Mounting bracket $14.26 → $14.10 -1.1%
  • WO-24102 Hinge pin $9.80 → $9.55 -2.6%
  • WO-24121 Gusset plate $4.90 → $4.72 -3.7%

WO-24098 cost per unit$44.10

  • Material $11.70
  • Labor $18.90
  • Overhead $13.50

Where the numbers come from

Every number traces back to a kiosk log or a component used.

Labor
Hours recorded at the kiosk times each operator’s rate, breaks left out.
Material
The components used, counted at the start or end of the job.
Overhead
A rate per labor hour that you set.
Other costs
Any cost lines you add to a work order.
The Aixly costing overview with total cost, cost per unit and the split between material, labor and overhead

Comparing with your standard costs

When an item’s actual cost moves away from its standard by more than your tolerance, Aixly flags it for review. You accept or ignore each change, and Aixly never changes the cost in your accounting system.

A report comparing costs with selling prices is planned.

See Aixly with your own work orders

Try the live demoLive demo available now

Try the live demo